Should-cost truth
Every part benchmarked to what it should cost.
Value analysis and value engineering powered by data — should-cost models, teardown analytics and design-to-cost — to take cost out of products and processes without touching value.
Cost is decided long before it is spent — in design and sourcing. We bring analytics to value engineering: should-cost benchmarks, teardown breakdowns and substitution analysis that quantify where margin is hiding and how to release it.
Eleven capabilities across the cost lifecycle, from design to supplier.

Structured, data-led value analysis that separates the cost that adds value from the cost that doesn’t — and takes the latter out.

A data-led scan across your products and spend that surfaces and ranks the biggest cost-out opportunities.

Bottom-up cost models that reveal what a part should cost — and the gap to what you actually pay.

Component-level teardown analytics that expose your — and competitors’ — cost, driver by driver.

Cost targets engineered into the design before commitments lock in — because most cost is decided long before it’s spent.

Analytics that align design choices with the cheapest, most reliable way to actually make them.

Fact-based cost positions that change how supplier negotiations end.

Substitution analysis that protects function and quality while cutting material and component cost.

Total-cost-of-ownership models that optimise cost across the whole product life — not just the purchase price.

Process analytics that strip waste, rework and inefficiency out of your cost base.

Early, data-backed feasibility checks — cost, market and manufacturability — before money is committed.
Where cost intelligence plugs into the operation.
Representative outcomes we engineer in this area.

Every part benchmarked to what it should cost.

Cost exposed driver by driver.

Fact-based positions for supplier talks.
Bring a real decision or dataset — we’ll show you how KEPLER would approach it, with no obligation.
Talk to our VAVE teamThe same path from teardown to realised saving.
Products and processes are broken down to their cost drivers.
Should-cost models set the reference for every component.
Opportunities are surfaced, sized and prioritised.
Each idea is modelled into a hard, defensible number.
Savings are tracked from design and sourcing into the P&L.
Cost taken out where it hides, without touching what customers value.
The difference once cost intelligence is live.
Cost out without cutting what customers value.
Opportunities quantified and prioritised.
Suppliers meet a fact-based should-cost.
The technical engine that makes this work dependable in production.
The industries this work serves.
Representative problems teams bring to KEPLER here. Click any use case for the detail.

~10% cost of goods addressable
View details →A product goes through revision after revision, each one adding a little cost and none taking any out. Eventually the margin is gone, and no one can say which functions the cost actually buys - so every cost-down idea looks like a reliability risk and stalls.
A ranked value-engineering backlog that can be worked in order, with reliability-neutral ideas separated from the ones that need testing. Typically a tenth of product cost sits in the addressable tier.

10–15% variant cost removable
View details →Years of customer-specific tweaks leave hundreds of variants of one product family. The cost of that proliferation is real, but it's buried across separate BOMs, so two 'similar' parts can never actually be compared.
A shortlist of over-specified variants and standardisation candidates, each with cost-to-serve attached, so sourcing can act on the biggest first.

3–5 pts launch margin recovered
View details →Cost modelling shows a new product landing below target margin, and the gap surfaces late - weeks from tooling freeze. After freeze the cost is locked, so the window to change anything cheaply is closing.
Enough reliability-neutral changes identified to close most of the margin gap while the design is still cheap to move.

5–7% cost typically addressable
View details →A programme sources thousands of machined and cast parts and negotiates on last year's price plus an increase. With no independent view of what a part should cost, every negotiation starts from the supplier's number, and the overpriced parts stay hidden.
On a scope of several thousand parts, five to seven percent typically shows up as addressable, concentrated in the highest-variance items (illustrative).

~50% faster quote turnaround
View details →When every estimator builds quotes their own way, turnaround is slow and the same assembly can be priced two ways. That inconsistency costs credibility on the bid and sometimes the bid itself.
Quote turnaround drops sharply and estimates land on a consistent, explainable basis that holds up in front of the customer.

2–4% avoidable price increase
View details →Price-increase letters arrive from single-source suppliers and get paid, because without a cost basis there's no way to tell a justified increase from an opportunistic one.
Price increases move from automatic to negotiated, each one met with a costed counter-position.

10–15% cost delta explained
View details →Sales knows a competitor product is cheaper; engineering can't say where the gap comes from. 'They're just cheaper' is not something you can design against.
A part-level cost bridge that turns 'they're cheaper' into a specific, addressable list of design and sourcing changes.

~20% subassembly cost out
View details →A subassembly looks expensive for its function, but suspicion doesn't survive a design review. The team needs the cost broken down component by component before anyone will act.
A costed list of simplification and substitution options, ranked by saving against the effort to change.

100% of BOM spend costed
View details →When a large spend is spread across tens of thousands of BOM line items, it's effectively invisible. Without a costed bill of materials, there's no way to see where the money goes or where to start.
End-to-end spend visibility across the full BOM - on programmes this can reach ~36,000 line items and over $1bn of spend - turned into a prioritised worklist (illustrative).

3–6% negotiation headroom
View details →A quote is a single number hiding material, process, overhead and margin. Negotiating against the number instead of the structure behind it leaves money on the table every time.
Category managers open each negotiation from the supplier's cost structure rather than last year's price.

~8% price harmonisation
View details →When plants source independently, often on different ERP systems, the same part clears at different prices in different places - and no one can see it, because the spend never sits in one view.
A price-harmonisation and consolidation list, sized by saving, that pays back the moment the first part is re-sourced (illustrative).

2–5% unjustified increase caught
View details →Suppliers raise prices citing raw-material inflation. Some claims are real and some aren't, but every one gets paid because there's no independent index to check them against.
A fact base that separates justified increases from opportunistic ones, so only the real ones get paid.

30–50 ideas pipelined
View details →VAVE ideas surface ad hoc, in a workshop that runs once a year and then dries up. Between workshops there's no data-driven way to keep opportunities flowing, so momentum stalls.
A continuously replenished VAVE pipeline ranked by value, so the next idea is always ready instead of waiting for the annual workshop.

80/20 focus on the vital few
View details →Teams spread VAVE attention across the whole catalogue, so effort lands on parts that barely move the needle while the real prizes go untouched.
VAVE effort concentrated where the money actually is, so the same headcount delivers more saving.

3–5× idea reuse across plants
View details →One plant solves a cost problem and the fix never reaches the others solving the same thing. Every site re-discovers the same saving from scratch.
Proven cost ideas reused across plants rather than re-invented, multiplying the return on each one.

15–25% cost locked at design
View details →By the time a cost target reaches engineering, most of the cost is already designed in. The team is asked to hit a number the architecture won't allow.
Cost designed in from the start rather than chased afterwards, with each subsystem carrying a target it can actually meet.

Live cost per option
View details →Designers pick materials, tolerances and features without a cost signal, so cost surprises only surface at sourcing, when changing anything is expensive.
Design decisions made with cost visible, so the cheaper path is chosen while it's still free to choose.

Fewer post-launch redesigns
View details →Margin gets fixed after launch through a scramble of change requests, which is the most expensive time to touch a design and disrupts supply.
Margin met at launch instead of retrofitted, cutting the expensive post-launch redesign cycle.

10–20% process cost out
View details →A part passes design review but fights the process: extra operations, tight tolerances that scrap yield, features that need special tooling. The cost hides in the shop, not the drawing.
Parts redesigned to fit the process, taking cost and scrap out without touching what the part does.

2–4 pts yield gained
View details →Recurring scrap gets managed on the line when its root cause is a design that's hard to make repeatably. The cost recurs every shift.
Chronic scrap designed out at source, lifting yield instead of managing loss shift after shift.

~15% assembly time cut
View details →Part counts, fastener variety and awkward access inflate assembly labour on every unit, but the cost is invisible on the drawing.
Lower assembly labour on every unit built, from a design that's quicker to put together.

8–15% material cost out
View details →Parts carry premium grades chosen years ago and never revisited. The material does more than the application requires, and pays for it on every unit.
A ranked list of material downgrades that hold function, each with the saving and the test needed to qualify it.

Fewer unique part numbers
View details →Designers reach for familiar components, so the BOM carries expensive or near-obsolete parts when a cheaper qualified equivalent exists.
A leaner, cheaper component set with less duplication and lower obsolescence exposure.

2nd source risk reduced
View details →A part depends on one material from one supplier. Price rises go unchallenged and a disruption stops the line, with no qualified alternative ready.
Qualified alternatives that ease price exposure and give the part a second source before it's needed.

Whole-life cost modelled
View details →Sourcing and design choices chase the lowest purchase price while warranty, service, energy and end-of-life costs, often larger, go unmodelled.
Decisions made on whole-life cost, so a low sticker price stops hiding a high lifetime bill.

Warranty drivers targeted
View details →Field failures cost real money but the data sits in service, disconnected from the design and supplier choices that caused them.
Warranty spend turned into a design signal, so the choices that fail in the field get fixed at source.

Downtime cost priced in
View details →On long-lived assets, maintenance and downtime over decades can exceed the purchase price many times over, yet the buying decision barely weighs them.
Capital decisions that account for the running cost they commit to for the next twenty years.

3–5 pts OEE gained
View details →Throughput is capped somewhere on the line, but the constraint shifts between shifts and products, so improvement effort lands in the wrong place.
Improvement aimed at the real bottleneck, lifting throughput without new capital.

2–6% material waste cut
View details →Scrap, giveaway and off-spec are baked into standard usage, so the loss looks normal and never gets challenged.
Hidden material loss surfaced and reduced, straight off the cost of goods.

8–12% energy per unit
View details →Energy is billed as one number and treated as unavoidable, so the process settings and idle time driving it are never optimised.
Energy managed as a controllable process cost, lowering consumption per unit produced.

Go/no-go on evidence
View details →A new product idea moves forward or dies on opinion and enthusiasm, with cost, volume and margin barely modelled until money is already committed.
A costed, evidence-based go/no-go before serious money is spent, not after.

Price-to-cost gap sized
View details →Marketing sets a price the market will bear; engineering isn't sure the product can be built under it. The gap only becomes clear late.
Early clarity on whether the target price is achievable, and what has to change if it isn't.

TCO make vs buy
View details →The choice to build in-house or outsource rests on partial numbers, missing overhead, capacity and risk, so it's often the wrong call.
A make-versus-buy decision grounded in true total cost, with the trade-offs made explicit.
No use cases match this filter yet — but the problem is almost certainly one we can help with.
Ask us about your problem →Send us a product line and we’ll show you where a should-cost view changes the conversation.
Talk to our VAVE team