
Cost has crept into a mature product over successive revisions
~10% cost of goods addressable
View details →Cost has crept into a mature product over successive revisions
A product goes through revision after revision, each one adding a little cost and none taking any out. Eventually the margin is gone, and no one can say which functions the cost actually buys - so every cost-down idea looks like a reliability risk and stalls.
- Map every component to the function it delivers, then put a cost against each function
- Run value-engineering sessions against that map instead of against opinion
- Score each idea on margin impact versus reliability risk and sequence the safe wins first
A ranked value-engineering backlog that can be worked in order, with reliability-neutral ideas separated from the ones that need testing. Typically a tenth of product cost sits in the addressable tier.














































































































